Tuesday, March 21, 2017

The interior is progressing nicely, at this point the Vee berth, head, hallway, forward lockers, Salon and Quarter Berth are finished with the new laminate.  The galley counter tops have been removed and the the existing ice box and refrigerator are ready for the evaporators.  A third box has been built and is ready for install.  We are making the three boxes so that they can be either or a refrigerator or icebox and all three compressors have the ability to be air or water cooled.  They will each have separate thermostats.   Also going in is the grey water sump tank, lots of fitting on the other tanks the deck is starting to be come together.  